Method · Access planning

High windows

The question “how do I clean my high windows?” has a hierarchy for an answer, not a product. In order: avoid the height entirely by cleaning from inside; move the method up the wall while you stay on the ground; and only then treat what is left as an access-planning problem for someone competent to plan it. This page walks that order and is honest about where DIY ends.

Before you start

  1. List the panes that are actually out of reach — it is usually fewer than it looks.
  2. Check which of them open inwards or are tilt-and-turn: those may not be “high windows” at all.
  3. Measure the geometry for the rest and run the pole reach planner.
  4. Compose the decision with the access decision sheet.

Step 1 — avoid the height

HSE’s window-cleaning guidance starts where every good plan starts: avoid work at height where reasonably practicable.[HSE] For a house, that means checking the boring options first: panes that open inwards clean from the room; tilt-and-turn units are designed for exactly this; and a pane you can reach through an adjacent opening may need a different order of work rather than different equipment. Inside-first is not timidity — it removes the entire falling problem from the job.

Step 2 — ground-based methods, checked against real geometry

Telescopic and water-fed poles move the cleaning method up the wall while your feet stay on the ground — HSE lists them alongside inside cleaning as ways to avoid working at height.[HSE] Two honesty rules make this step real rather than notional. First, use the manufacturer’s stated working length, not the advertised length, and check it against your building’s measured geometry — the pole reach planner does the trigonometry and refuses to flatter the answer. Second, respect that ground-based has its own hazard list: the HSE/FWC pole guide covers hoses, slips, manual handling, electrical lines, thunder and wind, and a defective pole is a stop, not a nuisance.[HSE/FWC]

Step 3 — what is left is access planning

When inside and ground methods genuinely run out, the next move is a decision, not a purchase. HSE’s step-by-step approach asks whether an existing safe place of work — a balcony, a protected walkway — already exists before any additional access equipment is considered.[HSE] Ladders sit in this landscape more narrowly than folklore suggests: not banned, but not an automatic first choice either — HSE frames them as an option for low-risk, short-duration work when better options are not reasonably practicable.[HSE] This site draws its line here on purpose: the access decision sheet composes one of four conservative states and never selects a ladder, tower, platform or product.

If competent planning determines that temporary access equipment is appropriate, Mammoth Hire’s access equipment hire range is one place to compare current tower, platform and powered-access options. The catalogue does not decide whether a method or item is appropriate for this window: selection, site checks, competence and the plan of work remain separate.

Paid work is a different category

If the window cleaning is a job — you are paying someone, or you are the someone — the Work at Height Regulations 2005 apply to whoever controls the work: it must be properly planned, appropriately supervised and carried out by competent people, with work at height avoided where reasonably practicable.[WAHR] A professional turning up with a pole system and a method statement is those duties working as intended. For your own private DIY, the regulations are not aimed at you — this site simply borrows their shape as a conservative planning framework, because the physics does not check the paperwork.

What “stop” actually buys you

Every stop state on this site converts a bad afternoon into a planning task: a pane that stays dirty for another week costs nothing, while the alternatives are not symmetrical. Stop, and either change the method — inside, geometry, water — or change the plan to include someone competent to design the access. The decision sheet exists so that the conclusion is written down, printable, and re-checkable when conditions change.

Sources used on this sheet

Correction and version note: written for content contract 2026-08-21.1; sources accessed 2026-08-20. Corrections are recorded on the methodology sheet.