Transparency · Contract 2026-10-17.1

Methodology

Every calculator on this site is governed by a written content-and-calculation contract (version 2026-10-17.1). This page describes what each sheet computes, what its results are allowed to say, and — just as importantly — the questions it refuses to answer.

What the sheets are

SheetClassificationWhat it does
Area & solution Transparent arithmetic · planning estimate Sums pane areas, applies your margin, and converts area to solution volumes using only your entered product-label application rate and selected dilution convention: ratio, percent or ml/L of final mixture.
Pole reach Transparent geometry · hard stop states Computes √((H−P)² + S²) + A and compares it with your entered usable pole length. Site-condition answers can stop the plan regardless of geometry.
Access decision Conservative decision composer Composes one of five planning states from eight answers and the work context. It is not a compliance checker and never selects equipment.
Time planner Transparent arithmetic · planning estimate area ÷ your productivity + setup + moves. No default productivity is authoritative.

Result vocabulary

Tool results use planning vocabulary only: planning estimate, geometric reach, entered values, stop and reassess, ground-based method fits the entered geometry, competent access planning required, check the product or film manufacturer’s instructions, insufficient information. A companion list of terms is banned from every result, interpretation, warning and assumption a sheet can emit — words that assert safety, compliance, approval, guarantees or suitability — and an automated scanner enforces the ban in the test suite and against the built site. A geometric margin is a length, never a safety margin.

Fail-closed rules

Each sheet refuses to produce a result rather than guess. Concretely:

How “unknown” answers are treated on the pole reach planner

The contract makes electrical hazards and thunder stop conditions when answered yes or unknown, and visibility a stop condition when answered no or unknown. For the remaining conditions — high wind, pole defect, obstructions, and control of the working area — an answer of yes (or no for area control) stops the plan, and an answer of unknown fails closed as Insufficient information: an unknown decisive condition never falls through to a geometric interpretation. Geometry values are withheld entirely in stop and insufficient states.

How the access decision composes its states

The five planning states and their exact verdict sentences are:

The state inside-first has its own verdict sentence; it never claims a ground-method geometry result.

  1. A missing or invalid answer or work context returns insufficient before hazard evaluation. All eight answers must be valid yes/no/unknown values.
  2. With complete valid answers, electrical-absence verification, weather/control acceptability or site control answered no or unknown returns stop.
  3. An unknown inside-practicable answer returns insufficient; yes returns inside-first without requiring later ground/access answers to be known.
  4. Otherwise an unknown view-from-ground, checked-ground-method or operator-competence answer returns insufficient before evaluating ground-method evidence.
  5. All three ground-method answers yes returns ground-method, even if the existing-place answer is unknown.
  6. Only when neither inside nor ground evidence resolves the plan does an unknown existing-place answer return insufficient. Either yes or no then returns access-planning; an existing place still needs site-specific confirmation by a competent person.

Area & solution dilution conventions

These existing dilution modes use volume arithmetic: ratio 1:n means 1 part concentrate plus n parts water, so concentrate = solution ÷ (n + 1); percent means concentrate = solution × percent ÷ 100; ml/L means concentrate = solution × ml/L ÷ 1000. Percent and ml/L refer to final mixture volume, not litres of water; water is the final volume minus concentrate. Doses per litre of water have a different denominator and must not be entered as per final litre. Mass percentages and chemical compatibility are not assessed. There is no universal dose or coverage recommendation. The product label controls the inputs.

Display rounding

Without JavaScript, and on paper

Every sheet ships as static HTML showing a labelled worked example (the area example and home preview explicitly use fictional arithmetic inputs), with its formula written out in words and a blank worksheet. JavaScript upgrades the sheet to a live calculation (“Current calculation from entered values”) and enables printing; a printed sheet is a plan record carrying the route, date, contract version, inputs, outputs, assumptions, stop state, disclaimer and source keys. While a sheet is edited or invalid, printing is unavailable and the record marks itself as having no current calculation.

Evidence and citations

Consequential technical claims link to the source registry, which records publisher, URL and the date each document was captured. The hierarchy: legislation and HSE guidance for work-at-height principles; the HSE/FWC best-practice guide for water-fed pole hazards and stop conditions; manufacturer documents for product-specific film care (labelled as product-specific, never universal); Kärcher’s guidance as general method context; and transparent arithmetic over your entered values for everything numeric. Where a source does not state a publication date, the registry says so rather than inventing one.

Corrections log

This site is an information project. It is not a window-cleaning contractor, shop, training provider or compliance checker, and its sheets are planning aids over your entered values — not professional advice.